The project included an analysis and report for issues experienced during the testing and balancing for the 90,000 SF, 2 Story MTF in Aviano, Italy. JPHES was able to identify seventeen air distribution issues as well as potential code violations for air exhaust and intake. All items were identified in a report with recommendations including ductwork modifications, static pressure comparisons, exhaust system redesigns, bio-med exhaust system modification, VAV box modifications and recommended motor replacements. The effort required an extremely flexible schedule as the opening date was on the horizon.