JP Harvey Engineering Solutions | Ogden Hall
15669
portfolio_page-template-default,single,single-portfolio_page,postid-15669,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode-theme-ver-6.1,wpb-js-composer js-comp-ver-5.1.1,vc_responsive

Ogden Hall

Category
Higher Education, Historic
About This Project

JPHES provided design services for the M/E/P systems for 35,000 SF of Auditorium Historic Restoration. The facility was a 1923 building with steam heating only.  JPHES was tasked with overcoming limited space for routing ductwork/piping to provide heating and cooling while keeping low sound criteria.  Additionally, the electrical system had to be upgraded and natural gas generators were provided to provide power in emergency conditions.